Drawing output error
도면이 교대 배근도 9번까지만 출력되고 나머지는 않됨 확인 부탁드립니다
Answer
안녕하세요. 한길아이티입니다. [교대입력]에서 날개벽에 대한 주철근,배력 및 전단철근의 입력이 누락되어 있습니다. 교대2~교대4에 대하여 임의로 수정하여 확인한 바 이상이 없습니다. 임의로 수정된 파일을 첨부하니 참조하시기 바랍니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 180 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 218 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 249 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 195 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 335 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 198 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 217 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 306 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 270 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 191 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 88 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 291 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 405 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 187 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 234 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 265 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 252 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 392 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 224 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 175 | 2026-09-16 |