Skip to content
AnsweredAAbutPierQ&A #1944832005-09-06 17:54 · Views 19

About the analysis result summary in the abutment calculation report

교대계산서 해석결과 요약에서 A2계산서 해석결과 요약에서 날개벽 주철근 삽도가 이상하게 나오네여. 수고하세요,,

Answer

안녕하세요. 한길아이티입니다. 수정하였습니다. 금일자 패치에 적용하도록 하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1812026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2192026-09-29
AnsweredAAbutPier#268520Pier seismic check2512026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K1992026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3352026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check1992026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2212026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3082026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2702026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1912026-09-18
AnsweredAAbutPier#268451Changing bearing location882026-09-18
AnsweredAAbutPier#268445Main rebar placement2922026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4072026-09-17
AnsweredAAbutPier#268433Pier alignment center1872026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2342026-09-17
AnsweredAAbutPier#268422Question about pier2652026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2532026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3942026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2252026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1782026-09-16
Sign in to ask