첨부자료의 PIER2의 경우를 보면 최대전단력의 발생하는 곳에서 최소전단철근량 이상을 배근함에 있어서 전단철근의 간격 입력란이 기둥중앙부로 되어 있습니다.(S=15.0cm -->30cm) 그래서 필요철근량이 N.G.로 표현됨은 아닌것 같은데.. 검토부탁드립니다.
Answer
안녕하세요. 한길아이티입니다. 전화상으로 말씀드렸습니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 181 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 219 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 251 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 200 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 335 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 201 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 221 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 308 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 270 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 192 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 88 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 292 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 408 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 188 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 235 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 265 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 253 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 396 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 225 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 179 | 2026-09-16 |