Skip to content
AnsweredAAbutPierQ&A #1942662005-08-29 20:50 · Views 46

Input method when slab and abutment construction joints differ

수고많으십니다.. 슬래브는 시공이음이 20mm이고 교대는 10mm로 다를경우 상부에서 입력한값이 하부로 그대로 적용이 되도록 되어 있는데.. 상부 내진설계를 위해선 상부쪽대로 제대로 입력을 하여야 하고.. 교대는 교대대로 입력을 하지 않으면 엇교각일경우 슈가 교좌면을 벗어나게 되니.. 어떤 방법으로 하여야 두가지를 다 만족할수 있을까요.. 바쁘시더라도 빠른 답변 좀 부탁드립니다.. 혹시 부연설명을 원하시면 [개인정보] [개인정보]입니다..

Answer

안녕하세요. 한길아이티입니다. 전화상으로 말씀드렸습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1812026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2192026-09-29
AnsweredAAbutPier#268520Pier seismic check2522026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K2012026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3352026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check2012026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2212026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3082026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2702026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1932026-09-18
AnsweredAAbutPier#268451Changing bearing location882026-09-18
AnsweredAAbutPier#268445Main rebar placement2922026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4082026-09-17
AnsweredAAbutPier#268433Pier alignment center1882026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2352026-09-17
AnsweredAAbutPier#268422Question about pier2652026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2532026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3962026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2252026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1792026-09-16