AnsweredAAbutPierQ&A #1938282005-08-09 02:24 · Views 52

Request to add earthwork when installing abutment retaining walls

교대 날개벽 옹벽설치시 토공수량이 안되므로 토공추가 바람니다. 수고하십시요....

Answer

안녕하세요. 한길아이티입니다. 전화상으로 말씀드렸습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1812026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2192026-09-29
AnsweredAAbutPier#268520Pier seismic check2532026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K2022026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3352026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check2022026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2212026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3092026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2712026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1932026-09-18
AnsweredAAbutPier#268451Changing bearing location882026-09-18
AnsweredAAbutPier#268445Main rebar placement2922026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4082026-09-17
AnsweredAAbutPier#268433Pier alignment center1882026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2352026-09-17
AnsweredAAbutPier#268422Question about pier2652026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2532026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3962026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2252026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1792026-09-16
Sign in to ask