첨부파일에 교대2 구조계산서 출력시 출력 중간에 계속 에러가 발생합니다. 교대2는 직접기초임. 거기에 좀 의심이 가는데 찾진 못하겠네요. 원인분석 부탁드립니다..
Answer
안녕하세요. 한길아이티입니다. 교대2의 경우 직접기초로 설정이 되어있지 않습니다. [설계교대입력]에 보시면 교대2가 말뚝기초로 되어 있으며, 말뚝제원등을 입력하지 않아 단면모양만 직접기초로 보이고 있습니다. [설계교대입력]에서 직접기초로 변경하신 후에 기타 입력값등을 확인하여 주시기 바랍니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 181 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 219 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 253 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 202 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 335 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 202 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 221 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 309 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 271 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 193 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 88 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 292 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 408 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 188 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 235 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 265 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 253 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 396 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 225 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 179 | 2026-09-16 |