How many confinement rebars?
안녕하세요. 심부구속철근수 때문에 문의드립니다. 2번 교각 목포P4에서 소성이 나오는데 심부구속철근개수 확인하고 싶습니다. 수고하세요.
Answer
안녕하세요. 한길아이티입니다. [기둥부 띠철근 배치]에서 IBs ~ IRs의 입력값이 누락되어 있습니다. ??s가 붙은 입력항이 심부구간에 대한 크로스타이에 대한 입력값입니다. 임의로 수정한 파일을 첨부하니 참조하시기 바랍니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 181 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 220 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 253 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 202 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 335 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 203 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 222 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 309 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 272 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 193 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 88 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 292 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 408 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 188 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 235 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 265 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 254 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 396 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 225 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 179 | 2026-09-16 |