Clothoid
파일첨부합니다. 클로소이드 좌표는 RP값과 동일한데 BTC, ETC, BC등등의 실길이가 RP와 상이하게 출력됨 좌표에 의해 산출하여보면 RP값이 맞는것 같은데 ALINE이 좀 이상한것 같은데 급합니다.
Answer
안녕하세요. 한길아이티입니다. BP 의 입력 좌표가 잘못되어있습니다. RP 데이터 출력물에서 와 B P X 173875.26918 BP 좌표 방위각 178˚ 31´ 52.54˝ Y 184889.58462 가 다릅니다. B P 0.00000 0+[전화]72.77000 184889.64870 178˚31´52.54˝ 를 ALine 입력하여 출력한 결과 RP 데이터와 꼭 같습니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 181 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 220 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 254 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 202 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 335 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 203 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 223 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 309 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 272 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 193 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 88 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 292 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 408 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 188 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 235 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 267 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 254 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 396 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 225 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 180 | 2026-09-16 |