AnsweredAAbutPierQ&A #1930442005-07-05 11:17 · Views 32

Company name appears garbled in the drawing title block

도각안에 회사명이 깨져버리는데 이유가 뭔지..... 부탁드립니다

Answer

안녕하세요. 한길아이티입니다. dgk 파일만으로는 확인이 불가능합니다. 도각을 만드신 dwg 파일을 첨부해주시기 바랍니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1812026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2202026-09-29
AnsweredAAbutPier#268520Pier seismic check2562026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K2022026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3362026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check2032026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2232026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3102026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2732026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1932026-09-18
AnsweredAAbutPier#268451Changing bearing location882026-09-18
AnsweredAAbutPier#268445Main rebar placement2932026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4102026-09-17
AnsweredAAbutPier#268433Pier alignment center1882026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2352026-09-17
AnsweredAAbutPier#268422Question about pier2672026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2542026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3982026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2252026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1802026-09-16
Sign in to ask