교대 날개벽 부분 D 구간에서 전단력, 모멘트를 공지시켜 A 구간에 발생하는 전단력, 모멘트를 계산하게 되어 있습니다. 그런데 D구간에서 공제하는 전단력, 모멘트중 토압에 의한 공제량이 약간 잘못 물려 있는 것 같습니다. 확인 좀 부탁드립니다. 첨부파일중 당초SHEET 는 APEIR 에서 나온 계산서이고, 변경SHEET는 저희가 수계산으로 바꾼 계산서입니다. 좋은 하루 되세요.
Answer
안녕하세요. 한길아이티입니다. 답변이 늦어 죄송합니다. "A"구간계산시 공제되는 "D"구간의 부재력에 대한 부분은 수정하여 금일자 패치에 적용하도록하겠습니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 181 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 220 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 256 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 202 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 336 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 203 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 223 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 310 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 273 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 193 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 88 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 293 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 410 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 188 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 235 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 267 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 254 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 398 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 225 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 180 | 2026-09-16 |