Please check the basis for quantity calculation

시,종점측 접속 슬래브 콘크리트 양생 수량 산근확인 부탁드립니다 (1) 6.700 x 5.304 = 35.537 (2) (6.416 + 6.700 ) / 2 x 0.274 = 1.797 (3) (6.700 + 6.700 ) / 2 x 0.274 = 1.836 (3)에서 6.700 + 6.700 인데 (2)번과 같은 사다리꼴로 수량이 산출되어야 하는게 아닌가요

Answer

안녕하세요. 한길아이티입니다. 전화로 말씀드렸습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1812026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2212026-09-29
AnsweredAAbutPier#268520Pier seismic check2562026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K2022026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3362026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check2032026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2232026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3112026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2732026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1932026-09-18
AnsweredAAbutPier#268451Changing bearing location882026-09-18
AnsweredAAbutPier#268445Main rebar placement2932026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4102026-09-17
AnsweredAAbutPier#268433Pier alignment center1882026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2352026-09-17
AnsweredAAbutPier#268422Question about pier2672026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2542026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3982026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2252026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1802026-09-16
Sign in to ask