각각의 교량은 문제가 없는데 하행선교량을 추가시키면 하행선 교량의 내진해석단면,내진해석 가로보 부분에서 가로보 모델링이 되지 않습니다...확인 부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 말씀하신 사항을 확인하였습니다. 수정하였으며 금일자 패치에 적용하도록 하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1812026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2212026-09-29
AnsweredAAbutPier#268520Pier seismic check2562026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K2022026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3362026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check2032026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2232026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3112026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2732026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1932026-09-18
AnsweredAAbutPier#268451Changing bearing location882026-09-18
AnsweredAAbutPier#268445Main rebar placement2932026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4102026-09-17
AnsweredAAbutPier#268433Pier alignment center1882026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2352026-09-17
AnsweredAAbutPier#268422Question about pier2672026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2542026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3982026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2252026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1802026-09-16
Sign in to ask