Issue with coping reinforcement detailing for hollow pier
중공교각 코핑부 배근을 해야 하는데 높이와 폭 모두 0 으로 인식하는데.. 검토 부탁드립니다...
Answer
안녕하세요. 한길아이티입니다. 입력하신 단면의 경우 코핑이 있는 형태인지 아닌지 판단할 수가 없습니다. 코핑에 대한 길이는 입력이 없고 두께만 입력이 되어 있습니다. 중공형의 벽식으로 하신 경우 첨부된 파일의 형태인 것 같습니다. 변경한 파일을 첨부하니 확인해 보시고 다른 사항이시면 게시판에 남겨주시기 바랍니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 181 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 221 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 257 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 202 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 336 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 203 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 223 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 312 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 274 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 193 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 88 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 293 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 410 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 188 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 235 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 267 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 254 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 398 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 226 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 180 | 2026-09-16 |