About wing walls on skewed bridges
수고하십니다 첨부하는 파일에서 보시는 바와같이 엇교일 경우 교대 날개벽이 전면에 배치되어야 하는 경우가 있습니다 프로그램에서 기능을 찾아보니 교대 전면에 날개벽이 설치되는 경우는 없는것 같은데 제가 못 찾았는지 아니면 기능이 없는지 알고싶습니다.
Answer
안녕하세요. 한길아이티입니다. 엇교량인 경우 날개벽이 기초앞굽으로 배치가 되는 경우에는 날개벽의 입력값을 조정하시면 됩니다. 입력값중 "L2"의 입력값을 (-)로 넣어주시면 앞굽으로 진행하는 형태의 날개벽이 됩니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 181 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 221 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 257 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 202 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 336 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 203 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 223 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 312 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 274 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 193 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 88 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 293 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 410 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 188 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 235 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 267 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 254 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 398 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 226 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 180 | 2026-09-16 |