Inquiry about changing rebar properties
교대벽체의 수직철근이 철근제원5(반경이있는 갈고리)로 되어있는데 이것을 철근제원2(반경0, 직각)로 바꾸려고 합니다. 배면 1단철근은 잘되는데 배면 2단, 전면 철근은 반경입력란을 삭제하면 철근이 출력되지않습니다. 그리고 글번호14498 겹이음길이 문의드렷었는데요. 묻고답하기 5533글에 필요하다면 겹이음 계산근거를 보내주신다고 하셨는데 첨부화일의 W1, W2철근의 겹이음길이 계산 근거를 보내주시면 감사하겠습니다.
Answer
안녕하세요. 한길아이티입니다. 벽체 수직철근의 상세를 직각으로 적용하시려면 [교대입력]-[벽체부배근]에서 "벽체수직철근 절곡부 처리" 에서 "직각"을 선택하시면 됩니다. 그리고 겹이음에 대한 부분은 계산하신 자료를 보내주시면 검토후 답변드리겠습니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 181 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 221 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 257 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 202 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 338 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 203 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 224 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 312 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 274 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 193 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 88 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 294 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 411 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 189 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 236 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 268 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 254 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 398 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 226 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 180 | 2026-09-16 |