Bridge bearing layout drawing outputs different coordinates
받침배치도상의 슬래브 끝단 좌표가 실제 좌표보다 1m정도 땡겨진 위치로 계산되어져있는데 확인 부탁드립니다. 캐드도면상에 본선Sta. 8+900과 9+000을 확인해보니 Apier상의 계산서 상에서 일치하는데 슬래브 끝단의 좌표가 틀리게 출력됩니다 (받침좌표까지는 확인하지 않음.) 받침배치도 광주방향 X:226787.42465 Y:259910.88917 X:226799.74135 Y:260050.27104 대구방향 X:226763.21897 Y:259913.02814 X:226775.53567 Y:260052.41001 실제좌표 광주방향 X:226787.5127 Y:259911.1853 X:226799.8294 Y:260051.2673 대구방향 X:226763.3070 Y:259914.0243 X:226775.6237 Y:260053.4063 참고로 본선 8+900 X:226776.90623 Y:259929.88878 9+000 X:226785.70859 Y:260029.50063 입니다 확인바랍니다
Answer
안녕하세요. 한길아이티입니다. 저희쪽에서는 잘못된 점을 발견하지 못하였습니다. 추가적인 질문이 계시면 연락 바랍니다. 전화로 말씀드렸습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 181 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 221 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 257 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 202 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 362 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 203 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 224 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 312 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 274 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 193 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 89 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 305 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 411 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 189 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 237 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 275 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 260 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 398 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 226 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 180 | 2026-09-16 |