Ground data mismatch in abutment foundation ground information
전화로 말씀드린 화일입니다.
Answer
안녕하세요. 한길아이티입니다. 입력하신 지반정보를 확인해보시면 기초지반위치의 지반정보가 없습니다. [교대입력]-[단면도제원]에서 "지반정보 표시"를 체크하시고 확인하시면 됩니다. 교대1의 경우는 기초하단아래부터 정보가 시작되고 교대2는 기초지반하단위에서 정보입력이 끝났습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #187630 | Hollow pier P-M interaction diagram output error | 38 | 2004-08-20 |
| Answered | AAbutPier | #187626 | About rebar input for bearings | 9 | 2004-08-20 |
| Answered | AAbutPier | #187625 | Ground data mismatch in abutment foundation ground information · Currently viewing | 39 | 2004-08-20 |
| Answered | AAbutPier | #187629 | Approach slab drawing generation error | 42 | 2004-08-20 |
| Answered | AAbutPier | #187622 | Incorrect dimensions shown for the uplift restraint device on abutment back face | 34 | 2004-08-20 |
| Answered | AAbutPier | #187621 | Foundation design in pier calculation report | 21 | 2004-08-20 |
| Answered | AAbutPier | #187617 | Uploading the file discussed by phone on deep beam shear design | 6 | 2004-08-20 |
| Answered | AAbutPier | #187614 | Guyeong Bridge 2 file | 8 | 2004-08-19 |
| Answered | AAbutPier | #187612 | Reactions in abutment structural calculation report differ from input values | 43 | 2004-08-19 |
| Answered | AAbutPier | #187611 | Output does not work | 26 | 2004-08-19 |
| Answered | AAbutPier | #187604 | Drawing generation error | 33 | 2004-08-19 |
| Answered | AAbutPier | #187603 | Shear rebar arrangement | 41 | 2004-08-19 |
| Answered | AAbutPier | #187605 | Pier foundation | 34 | 2004-08-19 |
| Answered | AAbutPier | #187602 | About the pier calculation report | 60 | 2004-08-19 |
| Answered | AAbutPier | #187595 | Error marks appear in the input tree, please take a look | 35 | 2004-08-19 |
| Answered | AAbutPier | #187598 | Question about merging files | 53 | 2004-08-18 |
| Answered | AAbutPier | #187590 | Structural calculation report - ultimate section forces in foundation design | 42 | 2004-08-18 |
| Answered | AAbutPier | #187587 | Is substructure design possible after beam layout? | 42 | 2004-08-18 |
| Answered | AAbutPier | #187586 | Pier structural calculation | 81 | 2004-08-18 |
| Answered | AAbutPier | #187581 | Abutment structural calculation (parapet on approach slab side) | 35 | 2004-08-18 |