Reactions in abutment structural calculation report differ from input values

교대 A1과 A2의 반력이 입력된 값과 상이합니다. 슈 8,9번이 이상한데 8,9번의 값이 1번과 2번의 값으로 물고 들어가네요 확인 바랍니다.

Answer

안녕하세요. 한길아이티입니다. 계산에 사용된 값은 이상이 없으나 테이블이 2개이상 생성되는 경우 출력에 오류가 있었습니다. 수정하였으며 금일자 패치에 적용하도록 하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#187630Hollow pier P-M interaction diagram output error382004-08-20
AnsweredAAbutPier#187626About rebar input for bearings92004-08-20
AnsweredAAbutPier#187625Ground data mismatch in abutment foundation ground information392004-08-20
AnsweredAAbutPier#187629Approach slab drawing generation error422004-08-20
AnsweredAAbutPier#187622Incorrect dimensions shown for the uplift restraint device on abutment back face342004-08-20
AnsweredAAbutPier#187621Foundation design in pier calculation report212004-08-20
AnsweredAAbutPier#187617Uploading the file discussed by phone on deep beam shear design62004-08-20
AnsweredAAbutPier#187614Guyeong Bridge 2 file82004-08-19
AnsweredAAbutPier#187612Reactions in abutment structural calculation report differ from input values · Currently viewing432004-08-19
AnsweredAAbutPier#187611Output does not work262004-08-19
AnsweredAAbutPier#187604Drawing generation error332004-08-19
AnsweredAAbutPier#187603Shear rebar arrangement412004-08-19
AnsweredAAbutPier#187605Pier foundation342004-08-19
AnsweredAAbutPier#187602About the pier calculation report602004-08-19
AnsweredAAbutPier#187595Error marks appear in the input tree, please take a look352004-08-19
AnsweredAAbutPier#187598Question about merging files532004-08-18
AnsweredAAbutPier#187590Structural calculation report - ultimate section forces in foundation design422004-08-18
AnsweredAAbutPier#187587Is substructure design possible after beam layout?422004-08-18
AnsweredAAbutPier#187586Pier structural calculation812004-08-18
AnsweredAAbutPier#187581Abutment structural calculation (parapet on approach slab side)352004-08-18
Sign in to ask