Applying continuous welded rail load

1. 장대레일하중 재하시 시점에서 종점 재하되어 있으나, 종점에서 시점으로 재하가 되지 않고 있습니다. 양뱡향 재하가 되어야 할것 같은데 확인 부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 장대레일 하중 양방향 제하 추가되었습니다. Aupdate 통하여 최신버전 update 후 사용하시기 바랍니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredACulvert#226364Inquiry about vertical earth pressure increase factor 2472005-07-29
AnsweredACulvert#226363Inquiry about culvert vertical earth pressure increase factor562005-07-29
AnsweredACulvert#226362Cannot change wall distribution rebar502005-07-29
AnsweredACulvert#226360Why does this happen?362005-07-29
AnsweredACulvert#226358Wing wall reinforcement detailing322005-07-29
AnsweredACulvert#226356Drawings are not generated302005-07-29
AnsweredACulvert#226355In basic data input712005-07-28
AnsweredACulvert#226353Allowable bearing capacity check852005-07-28
AnsweredACulvert#226351Error message during buoyancy check362005-07-28
AnsweredACulvert#226349Formula issue in pile check (seismic)402005-07-27
AnsweredACulvert#226347Please check362005-07-27
AnsweredACulvert#226345Suggested improvements912005-07-26
AnsweredACulvert#226339Bearing capacity check for channel box462005-07-22
AnsweredACulvert#226342Bracket402005-07-22
AnsweredACulvert#226340Distribution rebar in approach slab392005-07-22
AnsweredACulvert#226337Design lane width772005-07-22
AnsweredACulvert#226335Bearing capacity check for channel box522005-07-22
AnsweredACulvert#226333About the basic data input482005-07-19
AnsweredACulvert#226331Please check312005-07-18
AnsweredACulvert#226329Lap splices in the 2nd cycle312005-07-18
Sign in to ask