Skip to content
AnsweredAAbutPierQ&A #1359632015-12-03 22:13 · Views 290

LSD program error

P7설계시 [STM 해석] - > 교각 코핑 하중조합(교축:극한한계) 탭에서 권고안 버튼을 클릭하면 프로그램이 다운됩니다 검토하여 주시기 바랍니다...

Answer

안녕하세요. 한길아이티입니다. 하중조합을 초기화하는 과정에서 오류가 있었으며 수정작업을 완료하였습니다. 패치후 정상진행됩니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#205829Drawing text772007-08-17
AnsweredAAbutPier#205831When will the MASS foundation sliding check be updated?622007-08-17
AnsweredAAbutPier#205826About the foundation602007-08-17
AnsweredAAbutPier#205825Question about live load in bearing area check802007-08-17
AnsweredAAbutPier#205823Horizontal force calculation552007-08-17
AnsweredAAbutPier#205819Please merge two files732007-08-17
AnsweredAAbutPier#205812Additional pier file612007-08-17
AnsweredAAbutPier#205810Question about the number of bearings332007-08-16
AnsweredAAbutPier#205809Earth pressure calculation error in MASS foundation stability check392007-08-16
AnsweredAAbutPier#205808Quantity (rebar)402007-08-16
AnsweredAAbutPier#205805Errors in pier column reinforcement detailing and coping512007-08-16
AnsweredAAbutPier#205794Pier modeling analysis error322007-08-14
AnsweredAAbutPier#205792Maximum rebar ratio check formula is applied incorrectly372007-08-14
AnsweredAAbutPier#205789Cannot enter cover thickness622007-08-14
AnsweredAAbutPier#205786About entering the unit weight of embankment material292007-08-14
AnsweredAAbutPier#205781Internal error during pile check222007-08-14
AnsweredAAbutPier#205770When applying stepped rebar to a pier462007-08-14
AnsweredAAbutPier#205764Cannot enter the number of columns in pier section dimensions372007-08-13
AnsweredAAbutPier#205763Please check the pile layout292007-08-13
AnsweredAAbutPier#205759Uploading captured images and file402007-08-13
Sign in to ask