How to fix overlapping rebar in drawing output
Answer
안녕하세요. 한길아이티입니다. 좀더 정확한 파악을 위해서 작업중이신 작업파일 첨부 바랍니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | ACulvert | #225514 | Dead load calculation | 72 | 2004-11-15 |
| Answered | ACulvert | #225511 | Please review | 50 | 2004-11-14 |
| Answered | ACulvert | #225510 | During section check | 52 | 2004-11-13 |
| Answered | ACulvert | #225505 | About passage culvert | 70 | 2004-11-12 |
| Answered | ACulvert | #225504 | Question | 37 | 2004-11-12 |
| Answered | ACulvert | #225502 | Live load | 62 | 2004-11-12 |
| Answered | ACulvert | #225500 | Modeling error | 44 | 2004-11-12 |
| Answered | ACulvert | #225501 | Pile check | 45 | 2004-11-12 |
| Answered | ACulvert | #225496 | About culvert alignment | 45 | 2004-11-11 |
| Answered | ACulvert | #225498 | Checking U-type open channel results | 41 | 2004-11-11 |
| Answered | ACulvert | #225492 | Question about pavement inside water culvert | 56 | 2004-11-10 |
| Answered | ACulvert | #225489 | Error when opening file | 46 | 2004-11-10 |
| Answered | ACulvert | #225494 | About cover and rebar spacing | 56 | 2004-11-10 |
| Answered | ACulvert | #225487 | Retaining wall quantity check | 50 | 2004-11-10 |
| Answered | ACulvert | #225479 | Delay in generating quantity file | 53 | 2004-11-09 |
| Answered | ACulvert | #225485 | Question about wall rebar amount | 64 | 2004-11-09 |
| Answered | ACulvert | #225483 | Question about ground input | 47 | 2004-11-09 |
| Answered | ACulvert | #225481 | Question about section input | 49 | 2004-11-09 |
| Answered | ACulvert | #225477 | Retaining wall section check issue | 53 | 2004-11-09 |
| Answered | ACulvert | #225475 | About U-type and passage culvert | 76 | 2004-11-08 |
