Abutment width
기존 종점교대 폭원에서 양쪽 캔틸레버부만 0.05정도 증가 시킬려고 합니다 귀하의 프로그램네에서 자동으로 교대 폭원이 설정되는데 양쪽 0.05m정도만 교대폭원을 강제로 증가 시키수 있는지 빠른 답변 바랍니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #203009 | Wing wall reinforcement detailing | 7 | 2007-04-03 |
| Answered | AAbutPier | #203007 | Quantity output stops at 27% | 28 | 2007-04-03 |
| Answered | AAbutPier | #203002 | Entering wall-type pier dimensions | 29 | 2007-04-03 |
| Answered | AAbutPier | #203000 | Stability check | 23 | 2007-04-03 |
| Answered | AAbutPier | #203003 | Stability check | 30 | 2007-04-03 |
| Answered | AAbutPier | #202991 | Check of the wing wall section (urgent) | 81 | 2007-04-03 |
| Answered | AAbutPier | #202984 | Reinforcement detailing of bearing concrete block | 27 | 2007-04-02 |
| Answered | AAbutPier | #202992 | Question on enlarging the coping section of an existing pier and adding piles | 30 | 2007-04-02 |
| Answered | AAbutPier | #202980 | About the sole plate | 34 | 2007-03-31 |
| Answered | AAbutPier | #202978 | Error message during modeling analysis | 38 | 2007-03-31 |
| Answered | AAbutPier | #202970 | Horizontal force check | 36 | 2007-03-30 |
| Answered | AAbutPier | #202969 | Quantity calculation report output items | 44 | 2007-03-30 |
| Answered | AAbutPier | #202967 | Follow-up question on answer [***] | 37 | 2007-03-30 |
| Answered | AAbutPier | #202973 | Pile cap beam check | 57 | 2007-03-30 |
| Answered | AAbutPier | #202963 | Question on superstructure dead load in AAbutPier design conditions | 36 | 2007-03-30 |
| Answered | AAbutPier | #202959 | Seismic modeling error | 25 | 2007-03-30 |
| Answered | AAbutPier | #202958 | Abutment body reinforcement drawing | 26 | 2007-03-30 |
| Answered | AAbutPier | #202957 | Dimension lines for bottom rebar at bearing seat | 48 | 2007-03-30 |
| Answered | AAbutPier | #202954 | Seismic analysis | 54 | 2007-03-29 |
| Answered | AAbutPier | #202953 | Calculating stream flow pressure | 39 | 2007-03-29 |
