Skip to content
AnsweredAAbutPierQ&A #1873562004-08-04 20:25 · Views 92

Horizontal subgrade reaction coefficient

수고하십니다. 막히는 부분이 있어 질문 드립니다. 다름이 아니라 교대,교각 설계조건에서 수평지반변형계수(Eo),수직지반변형계수(Eo) 값을 바꾸려고 하는데.... 현재는 28N 으로되어있어서 10N 으로 고치려고 하는데 교대에서는 수동으로 바뀌는데 교각에서는 안바뀌더군요. 원래 이렇게 되어있는건지 아니면 다른기능에서 바꾸는것인지 알고 싶습니다. 일단은 첨부파일이 없는것 같아서 질문만 드립니다. 파일이 필요하시면 알려주세요 수고하십시요.

Answer

안녕하세요. 한길아이티입니다. 프로그램상의 오류입니다. 수정하여 금일 오전중에 패치에 적용하도록 하겠습니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#187398Distribution rebar for two-layer wall rebar372004-08-07
AnsweredAAbutPier#187396Abutment reinforcement drawing362004-08-07
AnsweredAAbutPier#187394When checking pier columns552004-08-06
AnsweredAAbutPier#187391In the pier reinforcement drawing422004-08-06
AnsweredAAbutPier#187385Error when generating drawings412004-08-06
AnsweredAAbutPier#187365Bearing location (individual input)182004-08-06
AnsweredAAbutPier#187363Program crashes when printing the seismic calculation report122004-08-06
AnsweredAAbutPier#187371Abutment reinforcement drawing182004-08-05
AnsweredAAbutPier#187369Follow-up question on bearing location132004-08-05
AnsweredAAbutPier#187364Editing hgrebar332004-08-05
AnsweredAAbutPier#187360About stream pressure on piers132004-08-05
AnsweredAAbutPier#187357About the pier cap202004-08-05
AnsweredAAbutPier#187348About bearings122004-08-05
AnsweredAAbutPier#187345About the pier cap142004-08-05
AnsweredAAbutPier#187356Horizontal subgrade reaction coefficient · Currently viewing922004-08-04
AnsweredAAbutPier#187353About the pier cap82004-08-04
AnsweredAAbutPier#187332In the EL calculation basis112004-08-03
AnsweredAAbutPier#187328About the drawing title block422004-08-03
AnsweredAAbutPier#187322Abutment section dimension input382004-08-03
AnsweredAAbutPier#187329About the drawing title block 2132004-08-03
Sign in to ask