Single pile check
단일형 말뚝 검토에서 강관파일을 적용하고 싶은데... 적용할수 있는 방법이 무엇인지 궁금합니다.. 수고하세요...
Answer
안녕하세요. 한길아이티입니다. 강관파일을 적용한 단일현장타설 말뚝을 말씀하시는 것으로 판단되나 AAbutPier에서는 주로 사용하는 형식을 지원하는 자동화설계지원 프로그램으로서 단일현장타설 말뚝은 콘크리트현장타설말뚝으로 기둥과 동일한 제원 만을 지원하고 있습니다. 도움을 드리지 못해 죄송합니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #201573 | Uploading file following my phone call | 47 | 2006-12-27 |
| Answered | AAbutPier | #201568 | Seismic analysis of rigid-frame bridge abutment | 73 | 2006-12-27 |
| Answered | AAbutPier | #201579 | ABEAM DECK compatibility? | 37 | 2006-12-27 |
| Answered | AAbutPier | #201576 | Thanks for the answer, one more question | 70 | 2006-12-27 |
| Answered | AAbutPier | #201567 | Seismic analysis modeling? | 63 | 2006-12-27 |
| Answered | AAbutPier | #201564 | Earthwork quantity looks wrong | 55 | 2006-12-27 |
| Answered | AAbutPier | #201562 | Pier reinforcement drawing issue | 52 | 2006-12-27 |
| Answered | AAbutPier | #201560 | Runtime error | 44 | 2006-12-26 |
| Answered | AAbutPier | #201558 | Modeling analysis does not run | 37 | 2006-12-26 |
| Answered | AAbutPier | #201555 | Internal program error during seismic calculation | 62 | 2006-12-26 |
| Answered | AAbutPier | #201551 | Pile reaction looks wrong | 63 | 2006-12-23 |
| Answered | AAbutPier | #201548 | Wing wall length depending on thickness | 29 | 2006-12-23 |
| Answered | AAbutPier | #201543 | Please check the quantity report | 45 | 2006-12-22 |
| Answered | AAbutPier | #201540 | Internal application error | 43 | 2006-12-22 |
| Answered | AAbutPier | #201538 | Borehole log and abutment calculation report results? | 61 | 2006-12-22 |
| Answered | AAbutPier | #201535 | Elastic seismic force issue | 52 | 2006-12-22 |
| Answered | AAbutPier | #201532 | Please check wing wall main rebar | 32 | 2006-12-22 |
| Answered | AAbutPier | #201526 | Error during seismic analysis | 52 | 2006-12-22 |
| Answered | AAbutPier | #201520 | File for question [24702] (no content) | 68 | 2006-12-20 |
| Answered | AAbutPier | #201518 | Abutment report: backfill earth pressure (normal, vertical) in foundation design loads, etc. | 69 | 2006-12-20 |