Skip to content
AnsweredAAbutPierQ&A #1319602015-03-18 16:05 · Views 267

Please convert .sbi file to .s2k file

통화후 파일 첨부합니다... sbi파일을...s2k 파일로 바꿔주세요... [회사] [개인정보] [[개인정보]]([[개인정보]])

Answer

안녕하세요. 한길아이티입니다. sbi파일은 ARoad, ABeamDeck 등 한길아이티의 상부프로그램에서 하부설계를 위해 작성된 교량 정보 파일입니다. AAbutPier의 파일메뉴-가져오기로 해당 파일을 읽어 들여 상부 및 상부 반력의 입력을 대체할 수 있는 것으로 상부의 해석모델링은 포함하고 있지 않습니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#200895File won't open522006-11-06
AnsweredAAbutPier#200892Cross beam settings in seismic analysis342006-11-06
AnsweredAAbutPier#200888Calculation report error - file attached312006-11-04
AnsweredAAbutPier#200884Error when printing abutment structural calculation report202006-11-03
AnsweredAAbutPier#200880Error when printing abutment structural calculation report172006-11-03
AnsweredAAbutPier#200877Question about load factors in abutment section force calculation302006-11-03
AnsweredAAbutPier#200886Calculation report error242006-11-03
AnsweredAAbutPier#200876Lap splice length262006-11-03
AnsweredAAbutPier#200866Basis for calculating parapet height (PH)572006-11-02
AnsweredAAbutPier#200863Question about seismic analysis502006-11-02
AnsweredAAbutPier#200875Surcharge load642006-11-02
AnsweredAAbutPier#200861Corbel & friction522006-11-02
AnsweredAAbutPier#200855Modeling error in seismic analysis312006-11-01
AnsweredAAbutPier#200850Please check the abutment front view442006-11-01
AnsweredAAbutPier#200842Question about scaffolding quantity302006-11-01
AnsweredAAbutPier#200853Uploading pier calculation report and APier file from *** inquiry472006-11-01
AnsweredAAbutPier#200844Pier column section design312006-11-01
AnsweredAAbutPier#200843Regarding fixed-end abutment check422006-11-01
AnsweredAAbutPier#200834Asymmetric columns on foundation252006-10-31
AnsweredAAbutPier#200833Question on cast-in-place pile calculation report output302006-10-31
Sign in to ask