Skip to content
AnsweredAAbutPierQ&A #1308292015-01-05 15:47 · Views 221

Follow-up to question 130749

전화로 말씀드린대로 과업 시기를 찾아봤습니다 2011년 9월에 성과품이 작성되었습니다. 프로그램 부탁드립니다 수고하세요

Answer

안녕하세요. 한길아이티입니다. 메일로 프로그램 송부해드렸습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#199864Please review202006-08-31
AnsweredAAbutPier#199861Wind load applied to columns in SAP data check242006-08-31
AnsweredAAbutPier#199858General drawing output issue for each pier with variable-section mass142006-08-31
AnsweredAAbutPier#199871[Urgent] How do I find the negative reaction (uplift) on piles?162006-08-31
AnsweredAAbutPier#199855Check for hollow pier reinforcement detailing212006-08-31
AnsweredAAbutPier#199850Slope treatment of bearing seats at piers82006-08-30
AnsweredAAbutPier#199849Span length for wind load distribution292006-08-30
AnsweredAAbutPier#199845Error during pier foundation reinforcement detailing162006-08-30
AnsweredAAbutPier#199843Wall-type pier182006-08-30
AnsweredAAbutPier#199847Mass step in abutment foundation332006-08-30
AnsweredAAbutPier#199842Pier pile layout202006-08-30
AnsweredAAbutPier#199839Calculation report is not output152006-08-30
AnsweredAAbutPier#199832In the drawings222006-08-29
AnsweredAAbutPier#199827Please review wall-type pier172006-08-29
AnsweredAAbutPier#199825Pier cap reinforcement detailing152006-08-29
AnsweredAAbutPier#199834Question about chamfer installation212006-08-29
AnsweredAAbutPier#199823Drawings are not output in the specified font132006-08-29
AnsweredAAbutPier#199822Error when changing cross-section configuration122006-08-29
AnsweredAAbutPier#199821Drawing generation error192006-08-29
AnsweredAAbutPier#199819When applying pile reactions to pile foundations182006-08-28
Sign in to ask