Skip to content
AnsweredAAbutPierQ&A #1287362014-09-04 02:54 · Views 160

Temperature load

안녕하세요 질의사항은 파일에 첨부하였습니다.

Answer

안녕하세요. 한길아이티입니다. 온도하중은 하중방향을 특정할 수 없는 하중으로 적용하고 있어 하중의 방향을 변경하도록 지원하지는 않고 있습니다. 하중조합 기본값에서 +/-를 모두 고려하고 있습니다. 감사합니다.

Attached images 1

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#197760Urgent: cannot edit shoe coordinates822006-02-20
AnsweredAAbutPier#197758Seismic analysis section input and adding files1412006-02-20
AnsweredAAbutPier#197759Seismic582006-02-20
AnsweredAAbutPier#197747Missing loads when creating SAP input file for foundation modeling612006-02-18
AnsweredAAbutPier#197738Bridge level difference when entering pier section652006-02-17
AnsweredAAbutPier#197729Multi-column piers842006-02-16
AnsweredAAbutPier#197726Wing wall and abutment structural drawing sections352006-02-16
AnsweredAAbutPier#197720Effective cross-sectional area of columns822006-02-16
AnsweredAAbutPier#197736Changing the H4 value202006-02-16
AnsweredAAbutPier#197734Entering rebar specifications for cast-in-place piles602006-02-16
AnsweredAAbutPier#197728Applicability of bundled bars492006-02-16
AnsweredAAbutPier#197722Changing design criteria values for salt damage protection392006-02-16
AnsweredAAbutPier#197719Alignment file552006-02-16
AnsweredAAbutPier#197711Checking bearing capacity of cast-in-place piles1152006-02-16
AnsweredAAbutPier#197710Seismic analysis522006-02-16
AnsweredAAbutPier#197707Step rebar in pier cap712006-02-16
AnsweredAAbutPier#197705Seismic analysis472006-02-16
AnsweredAAbutPier#197702Calculating earthwork quantities for abutments362006-02-15
AnsweredAAbutPier#197698Error302006-02-15
AnsweredAAbutPier#197697About seismic analysis results362006-02-15
Sign in to ask