Skip to content
AnsweredAAbutPierQ&A #1871702004-07-23 15:26 · Views 16

Approach slab

접속슬래브 배근에서 2단배근이 가능한지요....

Answer

안녕하세요. 한길아이티입니다. 접속슬래브의 2단배근은 현재 지원되지 않고 있습니다. 검토후 추후에 반영하도록 하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#187216Pier bearing dimensions202004-07-28
AnsweredAAbutPier#187206Inquiry about abutments and piers292004-07-27
AnsweredAAbutPier#187205Reposting552004-07-27
AnsweredAAbutPier#187200Please check the quantities602004-07-27
AnsweredAAbutPier#187198Question about shoe specification input332004-07-27
AnsweredAAbutPier#187209Inquiry about wing wall end EL values232004-07-27
AnsweredAAbutPier#187204Patch file442004-07-27
AnsweredAAbutPier#187196Request to change pile length from 5.9 to 4.6402004-07-27
AnsweredAAbutPier#187191Please check seismic horizontal force calculation for elastomeric bearings802004-07-26
AnsweredAAbutPier#187189When checking pier design492004-07-26
AnsweredAAbutPier#187184SAP error in seismic analysis for IPC bridge502004-07-26
AnsweredAAbutPier#187193Quantity report output problem462004-07-26
AnsweredAAbutPier#187183Distribution bars look wrong in abutment wing wall reinforcement drawing412004-07-26
AnsweredAAbutPier#187182When outputting the pier calculation report192004-07-25
AnsweredAAbutPier#187181In the pier structural calculation report552004-07-24
AnsweredAAbutPier#187180Internal application error462004-07-24
AnsweredAAbutPier#187173Jinhwa seismic: reposting162004-07-24
AnsweredAAbutPier#187175Whether column rebar ratio is applied762004-07-23
AnsweredAAbutPier#187174Structural calculation report - bearing check error402004-07-23
AnsweredAAbutPier#187170Approach slab · Currently viewing162004-07-23
Sign in to ask