Skip to content
AnsweredAAbutPierQ&A #1277892014-07-16 19:02 · Views 195

Question about STM

첨부파일의 교각1설계검토시 최소철근비검토에서 적용된 철근비가 0으로 나오는데 두부보 배근에서 수평,수직전단철근을 입력해넣었고 전단철근의 직경을 상향조정하여보아도 안되네요 검토 부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 첨부파일을 확인하였습니다. 해당 부분은 수직타이가 존재하지 않는 모데링이기에 나타나는 현상이었습니다. 올려주신 파일을 보게되면 주응력 흐름과 일치하지 않는 경사타이가 발생되고 있기에 수직타이가 발생하지 않게 되는 사항으로 보입니다. 해당 파일의 모델링을 수정하여 첨부합니다. 감사합니다.

Attached images

Attached images 1

1 attached file · Only the person who posted and our support staff can open them.

Sign in if this is your post

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#196741Please review122005-12-13
AnsweredAAbutPier#196737About pier reinforcement detailing162005-12-13
AnsweredAAbutPier#196736Inquiry about seismic analysis modeling error102005-12-13
AnsweredAAbutPier#196735Abutment reinforcement drawing112005-12-13
AnsweredAAbutPier#196730Modeling when running seismic analysis132005-12-13
AnsweredAAbutPier#196731About rebar reinforcement detailing132005-12-13
AnsweredAAbutPier#196726In seismic analysis62005-12-13
AnsweredAAbutPier#196723Question about main rebar in railway bridge abutment foundation52005-12-13
AnsweredAAbutPier#196717Abutment ELEVATION172005-12-13
AnsweredAAbutPier#196716About column moment magnification532005-12-13
AnsweredAAbutPier#196715About the approach slab192005-12-13
AnsweredAAbutPier#196713Error generating seismic input data102005-12-12
AnsweredAAbutPier#196707Reinforcement drawing error132005-12-12
AnsweredAAbutPier#196706Please check rebar spacing on the buffer slab drawing112005-12-12
AnsweredAAbutPier#196694Seismic calculation report output error72005-12-09
AnsweredAAbutPier#196688Check of distribution rebar diameter in approach slab92005-12-09
AnsweredAAbutPier#196684Pile layout error192005-12-09
AnsweredAAbutPier#196685Abutment wall surface finishing rebar232005-12-09
AnsweredAAbutPier#196680Abutment foundation rebar detailing looks wrong162005-12-09
AnsweredAAbutPier#196675Pile quantity112005-12-08