Error in pier cap beam section design
두부보 종방향 변단면인 교각 (P1, P6)인데요, 사용철근이 충분한데도 교량받침부에서 N.G가 뜹니다. 오류인것 같은데 검토 부탁드립니다. P1 교량받침1 N.G P6 교량받침 7,12 N.G apr파일 첨부합니다.
Answer
안녕하세요. 한길아이티입니다. 종방향 변단면의 경우 전열과 후열의 배근을 별도로 입력하도록 지원하고 있으며 검토에 있어서도 별도 검토 또는 낮은 단면, 전열, 후열을 적용할 수 있도록 옵션을 지원하고 있습니다. 후열에 해당하는 입력인 변단면에 전단 철근 입력을 적용하시거나 설계선택사항의 옵션을 [낮은 단면 적용]등으로 변경하시면 검토시 철근이 적용될 것입니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #196741 | Please review | 12 | 2005-12-13 |
| Answered | AAbutPier | #196737 | About pier reinforcement detailing | 16 | 2005-12-13 |
| Answered | AAbutPier | #196736 | Inquiry about seismic analysis modeling error | 10 | 2005-12-13 |
| Answered | AAbutPier | #196735 | Abutment reinforcement drawing | 11 | 2005-12-13 |
| Answered | AAbutPier | #196730 | Modeling when running seismic analysis | 13 | 2005-12-13 |
| Answered | AAbutPier | #196731 | About rebar reinforcement detailing | 13 | 2005-12-13 |
| Answered | AAbutPier | #196726 | In seismic analysis | 6 | 2005-12-13 |
| Answered | AAbutPier | #196723 | Question about main rebar in railway bridge abutment foundation | 5 | 2005-12-13 |
| Answered | AAbutPier | #196717 | Abutment ELEVATION | 17 | 2005-12-13 |
| Answered | AAbutPier | #196716 | About column moment magnification | 53 | 2005-12-13 |
| Answered | AAbutPier | #196715 | About the approach slab | 19 | 2005-12-13 |
| Answered | AAbutPier | #196713 | Error generating seismic input data | 10 | 2005-12-12 |
| Answered | AAbutPier | #196707 | Reinforcement drawing error | 13 | 2005-12-12 |
| Answered | AAbutPier | #196706 | Please check rebar spacing on the buffer slab drawing | 11 | 2005-12-12 |
| Answered | AAbutPier | #196694 | Seismic calculation report output error | 7 | 2005-12-09 |
| Answered | AAbutPier | #196688 | Check of distribution rebar diameter in approach slab | 9 | 2005-12-09 |
| Answered | AAbutPier | #196684 | Pile layout error | 19 | 2005-12-09 |
| Answered | AAbutPier | #196685 | Abutment wall surface finishing rebar | 23 | 2005-12-09 |
| Answered | AAbutPier | #196680 | Abutment foundation rebar detailing looks wrong | 16 | 2005-12-09 |
| Answered | AAbutPier | #196675 | Pile quantity | 11 | 2005-12-08 |