Horizontal subgrade reaction coefficient cannot be entered when designing pier on single cast-in-place pile
교각을 단일현장타설말뚝으로 설계시 토사부 수평지반반력계수가 입력되지 않습니다. 교각의 frame 해석에서 [spring값 사용자 편집]을 보면 암층은 값이 입력되어있으나 토사층은 0으로 나와있습니다. 어떤값은 수정해야하는지 확인좀 부탁드립니다.
Answer
안녕하세요. 한길아이티입니다. 단일현장타설 말뚝의 스프링계수는 지반의 Eo를 이용하여 산정하고 있습니다. Eo입력 또는 [Spring값 사용자 편집]에서 [사용자 입력 Spring값 사용]을 이용하셔야 합니다. http://www.aroad.co.kr/customer/sub01_01_view.asp?tname=p_faq&page=1&curref=694&curstep=0&curlevel=0&idx=915&main_category=1_4&sub_category=1_4_8&end_category=1_4_8_1&lv4_category=1_4_8_1_4&key=total&keystring=단일&num=694 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #196189 | Cross tie rebar quantity error | 14 | 2005-11-18 |
| Answered | AAbutPier | #196184 | Distance from parapet to shoe center | 28 | 2005-11-18 |
| Answered | AAbutPier | #196181 | Seismic pile reactions in pier foundation design with cast-in-place piles | 39 | 2005-11-18 |
| Answered | AAbutPier | #196170 | Column design for a sway (unbraced) structure | 50 | 2005-11-18 |
| Answered | AAbutPier | #196183 | Pile load test quantity | 29 | 2005-11-18 |
| Answered | AAbutPier | #196182 | Coefficient of horizontal subgrade reaction | 31 | 2005-11-18 |
| Answered | AAbutPier | #196179 | When changing rebar details | 38 | 2005-11-18 |
| Answered | AAbutPier | #196174 | Changing main rebar to two layers | 65 | 2005-11-18 |
| Answered | AAbutPier | #196161 | Temperature load calculation for pier at expansion joint seems wrong | 90 | 2005-11-18 |
| Answered | AAbutPier | #196158 | Drawing generation | 53 | 2005-11-18 |
| Answered | AAbutPier | #196155 | Pier bearing seat location mismatch | 35 | 2005-11-18 |
| Answered | AAbutPier | #196152 | Follow-up to phone inquiry | 68 | 2005-11-18 |
| Answered | AAbutPier | #196150 | About the stability index | 63 | 2005-11-18 |
| Answered | AAbutPier | #196149 | Shoe tonnage is entered incorrectly | 89 | 2005-11-18 |
| Answered | AAbutPier | #196142 | Additional question on 18970 | 64 | 2005-11-18 |
| Answered | AAbutPier | #196140 | About the left wing wall reinforcement drawing of the abutment | 71 | 2005-11-18 |
| Answered | AAbutPier | #196129 | Spread footing thickness check | 47 | 2005-11-17 |
| Answered | AAbutPier | #196163 | Rounding the bottom of the coping end | 11 | 2005-11-17 |
| Answered | AAbutPier | #196135 | Number of bearings per girder | 70 | 2005-11-17 |
| Answered | AAbutPier | #196121 | Cast-in-place pile rebar ratio | 59 | 2005-11-17 |