Rebar reinforcement detailing for single cast-in-place pile
단일현장타설 말뚝으로 설계를 하고있습니다. 교각은 D:1200mm 이고 말뚝은 D:1500mm 로 서로 직경이 틀립니다. 철근 배근을 서로 다르게 하고싶은데 붙임자료와 같이 배근이 가능한지 알고싶습니다.
Answer
안녕하세요. 한길아이티입니다. 현재 단일현장타설말뚝은 주철근을 기둥과 연속하여서만 지원하고 있어 문의하신 형태는 현재 지원이 되지 않고 있습니다. 도움을 드리지 못해 죄송합니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #196063 | Seismic analysis error message | 37 | 2005-11-15 |
| Answered | AAbutPier | #196058 | Please check | 35 | 2005-11-15 |
| Answered | AAbutPier | #196051 | Request | 24 | 2005-11-15 |
| Answered | AAbutPier | #196043 | Pier centerline display mismatch | 41 | 2005-11-15 |
| Answered | AAbutPier | #196045 | Pier modeling | 32 | 2005-11-14 |
| Answered | AAbutPier | #196038 | Running section check | 43 | 2005-11-14 |
| Answered | AAbutPier | #196030 | Seismic error | 38 | 2005-11-14 |
| Answered | AAbutPier | #196026 | Superstructure type | 34 | 2005-11-14 |
| Answered | AAbutPier | #196019 | Please be sure to fix this! | 83 | 2005-11-12 |
| Answered | AAbutPier | #196015 | Please check horizontal force | 35 | 2005-11-12 |
| Answered | AAbutPier | #196007 | Seismic modeling | 38 | 2005-11-11 |
| Answered | AAbutPier | #196005 | Pile layout | 24 | 2005-11-11 |
| Answered | AAbutPier | #195990 | Please check the seismic design | 62 | 2005-11-10 |
| Answered | AAbutPier | #195987 | Column main rebar placement error | 30 | 2005-11-10 |
| Answered | AAbutPier | #195985 | Error generating drawings after patch | 53 | 2005-11-10 |
| Answered | AAbutPier | #195981 | About cast-in-place pile calculation | 65 | 2005-11-10 |
| Answered | AAbutPier | #195978 | About individual pile placement | 53 | 2005-11-10 |
| Answered | AAbutPier | #195998 | Additional quantity options | 39 | 2005-11-10 |
| Answered | AAbutPier | #195983 | Working without an alignment | 82 | 2005-11-10 |
| Answered | AAbutPier | #195966 | End-side abutment wing wall reinforcement looks wrong | 38 | 2005-11-10 |