About the effective length factor k
교각기둥 계산시 유효길이계수를 횡구속에 대하여 1→1.2, 비횡구속에 대하여 2→2.1로 변경하였는데 교각기둥계산시 작용하중이 변경되어 단면력이 상이하게 나오네요 왜그런거죠
Answer
안녕하세요. 한길아이티입니다. 유선상으로 답변드렸습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #196063 | Seismic analysis error message | 37 | 2005-11-15 |
| Answered | AAbutPier | #196058 | Please check | 35 | 2005-11-15 |
| Answered | AAbutPier | #196051 | Request | 24 | 2005-11-15 |
| Answered | AAbutPier | #196043 | Pier centerline display mismatch | 41 | 2005-11-15 |
| Answered | AAbutPier | #196045 | Pier modeling | 32 | 2005-11-14 |
| Answered | AAbutPier | #196038 | Running section check | 43 | 2005-11-14 |
| Answered | AAbutPier | #196030 | Seismic error | 38 | 2005-11-14 |
| Answered | AAbutPier | #196026 | Superstructure type | 34 | 2005-11-14 |
| Answered | AAbutPier | #196019 | Please be sure to fix this! | 83 | 2005-11-12 |
| Answered | AAbutPier | #196015 | Please check horizontal force | 35 | 2005-11-12 |
| Answered | AAbutPier | #196007 | Seismic modeling | 38 | 2005-11-11 |
| Answered | AAbutPier | #196005 | Pile layout | 24 | 2005-11-11 |
| Answered | AAbutPier | #195990 | Please check the seismic design | 62 | 2005-11-10 |
| Answered | AAbutPier | #195987 | Column main rebar placement error | 30 | 2005-11-10 |
| Answered | AAbutPier | #195985 | Error generating drawings after patch | 53 | 2005-11-10 |
| Answered | AAbutPier | #195981 | About cast-in-place pile calculation | 65 | 2005-11-10 |
| Answered | AAbutPier | #195978 | About individual pile placement | 53 | 2005-11-10 |
| Answered | AAbutPier | #195998 | Additional quantity options | 39 | 2005-11-10 |
| Answered | AAbutPier | #195983 | Working without an alignment | 82 | 2005-11-10 |
| Answered | AAbutPier | #195966 | End-side abutment wing wall reinforcement looks wrong | 38 | 2005-11-10 |