When entering rebar properties
첨부된 파일의 철근제원입력시 [교대2], [접속슬래브-기타] 에서 권고안을 누르면 교량받침 아래 항목에 접속 및 완충슬래브 철근제원이 표시되었다가 사라지는데 그 값들이 이상합니다(예: -999999). 검토 부탁드립니다.
Answer
안녕하세요. 한길아이티입니다. [교대입력]-[전단 및 배력철근]입력세서 교대2번의 접속슬래브에 대한 입력을 확인하여 주시기바랍니다. 입력값이 설정이 되지않아 잘못된 계산을 하고 있습니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #187108 | Buffer slab drawing not generated | 6 | 2004-07-21 |
| Answered | AAbutPier | #187105 | Column tie rebar dimensions cannot be entered correctly... | 28 | 2004-07-21 |
| Answered | AAbutPier | #187100 | Foundation ground type in abutment design settings | 15 | 2004-07-21 |
| Answered | AAbutPier | #187096 | Problem with the general quantity summary table | 19 | 2004-07-21 |
| Answered | AAbutPier | #187090 | When entering rebar properties · Currently viewing | 11 | 2004-07-21 |
| Answered | AAbutPier | #187086 | Drawing generation error | 8 | 2004-07-21 |
| Answered | AAbutPier | #187084 | ***, please review | 13 | 2004-07-21 |
| Answered | AAbutPier | #187082 | Please review | 7 | 2004-07-21 |
| Answered | AAbutPier | #187080 | Pier tie rebar reinforcement detailing... | 9 | 2004-07-20 |
| Answered | AAbutPier | #187078 | Please review | 9 | 2004-07-20 |
| Answered | AAbutPier | #187076 | Reinforcement issue in the middle span of a multi-column pier | 8 | 2004-07-20 |
| Answered | AAbutPier | #187098 | Cell width in the structural calculation report | 16 | 2004-07-20 |
| Answered | AAbutPier | #187065 | Drawing generation error, cannot reinforce bearing seat | 7 | 2004-07-20 |
| Answered | AAbutPier | #187073 | Display error when entering abutment skew | 10 | 2004-07-20 |
| Answered | AAbutPier | #187071 | Error on the website Q&A board | 16 | 2004-07-20 |
| Answered | AAbutPier | #187058 | About the pier calculation report... | 24 | 2004-07-20 |
| Answered | AAbutPier | #187057 | Drawing generation | 19 | 2004-07-20 |
| Answered | AAbutPier | #187054 | Distribution rebar detailing on front face of parapet and wall at start abutment | 35 | 2004-07-20 |
| Answered | AAbutPier | #187053 | About the pier calculation report | 17 | 2004-07-19 |
| Answered | AAbutPier | #187060 | Cannot load analysis results... | 13 | 2004-07-19 |