P-Delta analysis results in column analysis
첨부된 apr 교각들 대부분 교각들에서 교각 기둥해석시 축력 최대케이스에서 P-delta에 의해 확대된 모멘트 값이 M2 모멘트 값 보다 조금씩 작아지게 되는데 확대된 모멘트값이 M2 모멘트보다 최소한 같거나 커야될거 같은데 값이 작아지는 이유가 궁금합니다.
Answer
안녕하세요. 한길아이티입니다. P-delta효과에 의해 증가되는 단면력은 대부분 기둥의 하단이며 다주식인 경우 프레임해석시 기둥의 상단이 더 큰경우가 있기 때문에 이경우에는 설계적용 단면력이 감소될 수도 있습니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #195538 | Two layers of wing wall main rebar | 15 | 2005-10-23 |
| Answered | AAbutPier | #195532 | Insufficient virtual memory error and existing data cannot be opened | 24 | 2005-10-22 |
| Answered | AAbutPier | #195530 | About the pier... | 24 | 2005-10-22 |
| Answered | AAbutPier | #195526 | Rebar quantity issue | 17 | 2005-10-22 |
| Answered | AAbutPier | #195537 | Earthwork quantity calculation error | 19 | 2005-10-21 |
| Answered | AAbutPier | #195523 | Pier modeling | 24 | 2005-10-21 |
| Answered | AAbutPier | #195517 | When importing an ARoad brx file... | 29 | 2005-10-21 |
| Answered | AAbutPier | #195515 | Wing wall haunch | 17 | 2005-10-21 |
| Answered | AAbutPier | #195513 | When checking the bridge bearing area | 18 | 2005-10-21 |
| Answered | AAbutPier | #195511 | Abutment reinforcement drawing | 19 | 2005-10-21 |
| Answered | AAbutPier | #195509 | When creating the bridge bearing layout drawing | 31 | 2005-10-21 |
| Answered | AAbutPier | #195506 | Internal application error | 33 | 2005-10-21 |
| Answered | AAbutPier | #195500 | Abutment reinforcement detailing looks wrong | 45 | 2005-10-21 |
| Answered | AAbutPier | #195495 | Pier general quantities | 58 | 2005-10-21 |
| Answered | AAbutPier | #195487 | Wing wall quantities | 51 | 2005-10-20 |
| Answered | AAbutPier | #195508 | Detail "A" not shown in abutment general drawing | 32 | 2005-10-20 |
| Answered | AAbutPier | #195501 | No piles in wing wall foundation | 22 | 2005-10-20 |
| Answered | AAbutPier | #195496 | Coping shape | 43 | 2005-10-20 |
| Answered | AAbutPier | #195486 | Allowable stress reduction ratio for pile splices | 51 | 2005-10-20 |
| Answered | AAbutPier | #195485 | N.G still occurs in foundation settings | 38 | 2005-10-20 |