Installing EPS blocks behind abutment
안녕하십니까? 3경간 RC 슬래브교 인상(H=90cm)에 따른 기존 교대의 안정성 확보를 위해 재설치하는 접속슬래브 하단에 EPS블럭(t=0.6m) 2단을 설치하여 수평토압 및 연직토사 하중을 감소시키려 계획하고자 합니다. 프로그램에서 고려가 가능한지 궁금합니다.
Answer
안녕하세요. 한길아이티입니다. AAbutPier에서 EPS블록을 지원하기는 하나 설치의 기준은 기초하면부터 적용하고 있습니다. 적용하시려는 것처럼 상단부터 설치는 지원하지 않고 있으니 참고하시기 바랍니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #195158 | Moving box | 45 | 2005-10-07 |
| Answered | AAbutPier | #195157 | EL values are correct but the section shape is wrong | 83 | 2005-10-07 |
| Answered | AAbutPier | #195156 | Bearings missing from general drawing, please check | 101 | 2005-10-07 |
| Answered | AAbutPier | #195149 | Cannot set cross beams in seismic analysis | 70 | 2005-10-07 |
| Answered | AAbutPier | #195143 | Please check abutment front view, delivery is imminent | 53 | 2005-10-07 |
| Answered | AAbutPier | #195139 | Abutment plan view looks wrong | 26 | 2005-10-06 |
| Answered | AAbutPier | #195134 | Error when calculating general quantities | 23 | 2005-10-06 |
| Answered | AAbutPier | #195123 | Earthwork calculation and shoe layout for separated up/down-line bridge | 63 | 2005-10-06 |
| Answered | AAbutPier | #195121 | Seismic analysis data error | 29 | 2005-10-06 |
| Answered | AAbutPier | #195117 | Drawing dimension error | 27 | 2005-10-06 |
| Answered | AAbutPier | #195113 | Drawing output error | 68 | 2005-10-06 |
| Answered | AAbutPier | #195150 | In a skewed bridge | 72 | 2005-10-06 |
| Answered | AAbutPier | #195126 | Rebar marking | 61 | 2005-10-06 |
| Answered | AAbutPier | #195118 | Entered bearing coordinates, please check | 52 | 2005-10-06 |
| Answered | AAbutPier | #195111 | SAP2000 error | 85 | 2005-10-06 |
| Answered | AAbutPier | #195108 | Quantity calculation | 63 | 2005-10-06 |
| Answered | AAbutPier | #195099 | Drawing dimension error | 47 | 2005-10-06 |
| Answered | AAbutPier | #195103 | About file layout | 70 | 2005-10-05 |
| Answered | AAbutPier | #195098 | Drawing output error | 71 | 2005-10-05 |
| Answered | AAbutPier | #195096 | Applying the revised bridge drainage criteria | 45 | 2005-10-05 |
