Rebar schedule should total SD40 and SD50 separately
수량산출서에서는 구분이 되는 것 가튼데 도면상에서는 함께 출력되어 구분이 필요할 것 같습니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #194881 | Seismic analysis | 28 | 2005-09-28 |
| Answered | AAbutPier | #194877 | Question about drawing output | 22 | 2005-09-28 |
| Answered | AAbutPier | #194872 | Question | 28 | 2005-09-28 |
| Answered | AAbutPier | #194854 | Please help resolve input issue | 16 | 2005-09-27 |
| Answered | AAbutPier | #194852 | Please check abutment rebar numbers... | 9 | 2005-09-27 |
| Answered | AAbutPier | #194848 | About wing walls | 20 | 2005-09-27 |
| Answered | AAbutPier | #194847 | Superelevation | 32 | 2005-09-27 |
| Answered | AAbutPier | #194846 | Wing wall rebar error? | 30 | 2005-09-27 |
| Answered | AAbutPier | #194844 | Girder layout in variable-width section | 30 | 2005-09-27 |
| Answered | AAbutPier | #194866 | Wing wall rebar error? | 37 | 2005-09-27 |
| Answered | AAbutPier | #194865 | Material table shows SD300 incorrectly after switching to SI units | 34 | 2005-09-27 |
| Answered | AAbutPier | #194861 | About seismic analysis | 21 | 2005-09-27 |
| Answered | AAbutPier | #194850 | About elevation | 37 | 2005-09-27 |
| Answered | AAbutPier | #194837 | Question about calculation report | 23 | 2005-09-27 |
| Answered | AAbutPier | #194841 | Hollow pier patch still not released | 16 | 2005-09-26 |
| Answered | AAbutPier | #194823 | About spread foundation.. | 27 | 2005-09-26 |
| Answered | AAbutPier | #194830 | Bridge bearing area check | 42 | 2005-09-26 |
| Answered | AAbutPier | #194820 | Bridge bearing specifications | 19 | 2005-09-26 |
| Answered | AAbutPier | #194801 | In track-type section | 14 | 2005-09-24 |
| Answered | AAbutPier | #194792 | SAP input data is not generated | 34 | 2005-09-23 |