Skip to content
AnsweredAAbutPierQ&A #1256272014-03-25 14:54 · Views 222

When will the patch for *** be released?

패치 후에는 괜찮다고 하셨는데 패치는 언제 되는겁니까? 계속 기다리고 있는데 패치는 언제쯤 된다고 알려주셔야죠

Answer

안녕하세요. 한길아이티입니다. 내부문제로 패치가 바로 적용되지 못하였습니다. 작업에 불편을드려 대단히 죄송합니다. 현재 패치가 완료되었으며 패치 적용가능합니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#194386About shear rebar calculation for columns..302005-09-03
AnsweredAAbutPier#194384Wing wall and parapet reinforcing rebar252005-09-03
AnsweredAAbutPier#194379Entering step rebar in the coping572005-09-03
AnsweredAAbutPier#194368Seismic horizontal force is excessively large372005-09-02
AnsweredAAbutPier#194373Design conditions?342005-09-02
AnsweredAAbutPier#194358Abutment wing wall section thickness transition zone402005-09-02
AnsweredAAbutPier#194354Seismic analysis392005-09-01
AnsweredAAbutPier#194352About SAP2000 auto-run602005-09-01
AnsweredAAbutPier#194347In pier reinforcement drawing (1)402005-09-01
AnsweredAAbutPier#194343Cannot place cross beams412005-09-01
AnsweredAAbutPier#194341Bearing pedestal concrete and shoe location462005-09-01
AnsweredAAbutPier#194340Uploading the Osaek pedestrian overpass292005-09-01
AnsweredAAbutPier#194333Urgent question about earthwork262005-09-01
AnsweredAAbutPier#194332Pier section forces come out 1.5 times higher352005-09-01
AnsweredAAbutPier#194328Bridge bearings182005-08-31
AnsweredAAbutPier#194321Error during seismic analysis322005-08-31
AnsweredAAbutPier#194320Elevation looks wrong382005-08-31
AnsweredAAbutPier#194311Please review172005-08-31
AnsweredAAbutPier#194317Uploading Osaek pedestrian overpass data282005-08-31
AnsweredAAbutPier#194301Approach slab drawing outputs incorrectly232005-08-30
Sign in to ask