Enabling program input
pier프로그램에서, 첨부한 그림과 같이 말뚝 N치 입력값들이 활성화가 안되고 있습니다. 교대와 P2,P3은 각기 활성화가 되어 개별적으로 넣을수 있게 되어 있는데 P1만 묶여 있는데 어떻게 해야 변경이 가능할런지요?
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #191784 | File does not open | 26 | 2005-05-10 |
| Answered | AAbutPier | #191789 | Strength reduction factor for punching shear in footing | 29 | 2005-05-10 |
| Answered | AAbutPier | #191781 | File does not open | 40 | 2005-05-10 |
| Answered | AAbutPier | #191776 | Error during modeling | 33 | 2005-05-09 |
| Answered | AAbutPier | #191774 | When generating drawings | 23 | 2005-05-09 |
| Answered | AAbutPier | #191780 | About wing wall calculation | 31 | 2005-05-09 |
| Answered | AAbutPier | #191770 | When printing calculation report | 15 | 2005-05-09 |
| Answered | AAbutPier | #191768 | Seismic analysis modeling | 26 | 2005-05-09 |
| Answered | AAbutPier | #191766 | 14374 APIER file | 16 | 2005-05-09 |
| Answered | AAbutPier | #191775 | Question 14375 again | 26 | 2005-05-09 |
| Answered | AAbutPier | #191769 | Inquiry about Aline | 19 | 2005-05-09 |
| Answered | AAbutPier | #191762 | Abutment reinforcement detailing | 21 | 2005-05-07 |
| Answered | AAbutPier | #191759 | Pier reinforcement drawing error | 20 | 2005-05-07 |
| Answered | AAbutPier | #191749 | Drawing generation error | 13 | 2005-05-06 |
| Answered | AAbutPier | #191747 | Seismic analysis | 13 | 2005-05-06 |
| Answered | AAbutPier | #191761 | Regarding pier input | 40 | 2005-05-06 |
| Answered | AAbutPier | #191754 | Applying two or more reference alignments | 23 | 2005-05-06 |
| Answered | AAbutPier | #191748 | Seismic analysis (brx file) | 13 | 2005-05-06 |
| Answered | AAbutPier | #191743 | About the pier general drawing | 21 | 2005-05-06 |
| Answered | AAbutPier | #191742 | Thank you | 15 | 2005-05-06 |

