Seismic load (horizontal force)
Answer
안녕하세요. 한길아이티입니다. 첨부파일로 해석을 진행후 확인하였으며, 정상적으로 입력되고 있다고 판단되었습니다. 최신패치후 재해석 진행하시기를 권해드립니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #191739 | When printing drawings | 18 | 2005-05-06 |
| Answered | AAbutPier | #191731 | Please check | 30 | 2005-05-04 |
| Answered | AAbutPier | #191729 | Please check steel pipe pile quantities at the abutment | 25 | 2005-05-03 |
| Answered | AAbutPier | #191705 | Error when considering bearing seat level difference | 16 | 2005-04-29 |
| Answered | AAbutPier | #191709 | Non-shrink mortar quantity (2) | 35 | 2005-04-29 |
| Answered | AAbutPier | #191704 | Non-shrink mortar quantity for expansion joints | 37 | 2005-04-29 |
| Answered | AAbutPier | #191702 | Parapet wall height | 23 | 2005-04-29 |
| Answered | AAbutPier | #191699 | In the earthwork quantity report | 44 | 2005-04-28 |
| Answered | AAbutPier | #191688 | Seismic + foundation member force check | 49 | 2005-04-27 |
| Answered | AAbutPier | #191696 | In the earthwork quantity report (2) | 55 | 2005-04-27 |
| Answered | AAbutPier | #191682 | Wing wall check | 24 | 2005-04-27 |
| Answered | AAbutPier | #191686 | Inquiry | 44 | 2005-04-27 |
| Answered | AAbutPier | #191683 | Question about the abutment general quantity summary table | 31 | 2005-04-27 |
| Answered | AAbutPier | #191680 | Seismic | 46 | 2005-04-27 |
| Answered | AAbutPier | #191671 | Slab bridge inquiry | 96 | 2005-04-27 |
| Answered | AAbutPier | #191670 | apier file (drawing output problem) | 29 | 2005-04-27 |
| Answered | AAbutPier | #191666 | Cast-in-place pile reinforcement detailing looks wrong | 32 | 2005-04-26 |
| Answered | AAbutPier | #191672 | Uploading files for cast-in-place piles | 119 | 2005-04-26 |
| Answered | AAbutPier | #191669 | Attaching cast-in-place pile calculation report (output in 3 tiers) | 49 | 2005-04-26 |
| Answered | AAbutPier | #191667 | Quantities should also include additional sod | 27 | 2005-04-26 |