Skip to content
AnsweredAAbutPierQ&A #1229312013-11-14 14:00 · Views 209

Inquiry about rebar input for unseating prevention device

1. 낙교 방지책쪽에 측면벽을 설계하여 아래 그림과 같이 배근을 하려고 하는데 단면의 수치가 이상하며 철근이 배근되는 형태도 맞지 않는 거 같습니다. 확인 부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. [개인정보] 에서 답변하도록 하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#191174Typo in approach slab calculation report612005-03-28
AnsweredAAbutPier#191170Error after coping beam reinforcement detailing602005-03-28
AnsweredAAbutPier#191166Different numbers of shoes at abutment and pier?852005-03-28
AnsweredAAbutPier#191164Request to reflect corner cut of abutment wing walls in calculations922005-03-28
AnsweredAAbutPier#191163Program suggestion1322005-03-25
AnsweredAAbutPier#191155Error when entering seismic analysis section812005-03-25
AnsweredAAbutPier#191154Pier seismic analysis does not work962005-03-25
AnsweredAAbutPier#191148Question about beam layout drawing422005-03-24
AnsweredAAbutPier#191145Odd user input values in seismic analysis results642005-03-24
AnsweredAAbutPier#191142Basis for EL calculation562005-03-24
AnsweredAAbutPier#191149When entering seismic analysis results352005-03-24
AnsweredAAbutPier#191139Cannot output structural calculation report942005-03-24
AnsweredAAbutPier#191129Please check horizontal force in foundation design (SV-02, SV07)1442005-03-24
AnsweredAAbutPier#191126"Modeling warnings exist in seismic analysis" message482005-03-24
AnsweredAAbutPier#191120Please check652005-03-23
AnsweredAAbutPier#191119Please confirm712005-03-23
AnsweredAAbutPier#191116Beam gap at continuous joint1422005-03-23
AnsweredAAbutPier#191118Drawing frames are not generated properly1252005-03-23
AnsweredAAbutPier#191112Drawing generation stops at the geological borehole log1042005-03-23
AnsweredAAbutPier#191106Error when checking pier bearing design722005-03-23
Sign in to ask