Abutment2 road centerline input
교량폭이 11.7m인데 교대1은 도로중심이 5.85로 정상적인데 교대 2의 도로중심거리가 엉뚱하게 나옵니다. 확인부탁합니다.
Answer
안녕하세요. 한길아이티입니다. 첨부 파일을 확인하였으며, 선형이 너무 짧게 입력되어져 있었습니다. 선형은 교량을 지나서 최소 30m 정도의 여유가 필요합니다. (교량의 폭원, 스큐에 따라서 더 많은 여유 선형길이가 필요합니다. ) 테스트 동영상 첨부합니다. 감사합니다.
Attached images
1 attached file · Only the person who posted and our support staff can open them.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #190856 | Please check seismic horizontal force values | 55 | 2005-03-04 |
| Answered | AAbutPier | #190852 | About slab input | 22 | 2005-03-04 |
| Answered | AAbutPier | #190843 | Mortar EL value when entering EL manually? | 27 | 2005-03-03 |
| Answered | AAbutPier | #190842 | Question and error check request for pile calculation | 47 | 2005-03-03 |
| Answered | AAbutPier | #190836 | When applying loads to the pier | 28 | 2005-03-03 |
| Answered | AAbutPier | #190827 | Please check | 27 | 2005-03-03 |
| Answered | AAbutPier | #190823 | Rebar reinforcement detailing check | 23 | 2005-03-03 |
| Answered | AAbutPier | #190821 | About shear rebar in the pier foundation | 67 | 2005-03-02 |
| Answered | AAbutPier | #190820 | Scaffolding quantity | 42 | 2005-03-02 |
| Answered | AAbutPier | #190813 | Inquiry about collision load input | 15 | 2005-03-02 |
| Answered | AAbutPier | #190831 | "Internal application error" in pier foundation reinforcement detailing | 37 | 2005-03-02 |
| Answered | AAbutPier | #190829 | Please check | 29 | 2005-03-02 |
| Answered | AAbutPier | #190828 | Please check | 17 | 2005-03-02 |
| Answered | AAbutPier | #190811 | Pier column tie bar arrangement | 34 | 2005-03-01 |
| Answered | AAbutPier | #190810 | Bridge width differs between general drawing and quantity report | 21 | 2005-03-01 |
| Answered | AAbutPier | #190808 | SAP launch error | 30 | 2005-03-01 |
| Answered | AAbutPier | #190802 | Error generating the seismic analysis model | 25 | 2005-03-01 |
| Answered | AAbutPier | #190794 | Coping beam shoe location | 22 | 2005-02-28 |
| Answered | AAbutPier | #190804 | Error in stiffener design (item 6) when generating the calculation report | 27 | 2005-02-28 |
| Answered | AAbutPier | #190793 | Pier reinforcement drawing is not drawn properly | 28 | 2005-02-28 |