Korea Expressway Corporation bridge bearing criteria
도로공사 교량 받침 기준 중 교량 코핑부 철근설계 개선 방안에 있는 교좌면 보강 철근이 반영이 현재 되고 있는지 알고 싶습니다. 도로공사 파일을 첨부해드립니다.
Answer
안녕하세요. 한길아이티입니다. 질의하신 사항을 현재 지원되고 있지 않습니다. 해당 부분에 대해서는 추후 검토를 통해서 지원할수 있도록 하겠습니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #190216 | Calculation of section forces in the heel | 51 | 2005-01-17 |
| Answered | AAbutPier | #190212 | About bearing seat for PSC beam | 70 | 2005-01-17 |
| Answered | AAbutPier | #190208 | When checking the bearing seat? | 39 | 2005-01-17 |
| Answered | AAbutPier | #190204 | Pier cap beam reinforcement | 56 | 2005-01-17 |
| Answered | AAbutPier | #190214 | About pier spread foundation calculation | 68 | 2005-01-17 |
| Answered | AAbutPier | #190213 | About PSC beam | 43 | 2005-01-17 |
| Answered | AAbutPier | #190201 | About the abutment foundation | 17 | 2005-01-16 |
| Answered | AAbutPier | #190196 | PSC continuous bridge | 45 | 2005-01-15 |
| Answered | AAbutPier | #190195 | About pier calculation report output | 15 | 2005-01-15 |
| Answered | AAbutPier | #190194 | Please fix abutment wing wall reinforcement error | 17 | 2005-01-15 |
| Answered | AAbutPier | #190189 | Slab plan | 26 | 2005-01-15 |
| Answered | AAbutPier | #190183 | File | 32 | 2005-01-14 |
| Answered | AAbutPier | #190181 | Drawing generation | 29 | 2005-01-14 |
| Answered | AAbutPier | #190186 | Applying ALINE to light rail | 56 | 2005-01-14 |
| Answered | AAbutPier | #190177 | About unseating prevention devices | 72 | 2005-01-14 |
| Answered | AAbutPier | #190175 | Approach slab width change by wing wall angle | 65 | 2005-01-14 |
| Answered | AAbutPier | #190178 | About pier coping | 63 | 2005-01-13 |
| Answered | AAbutPier | #190161 | Question about abutment seismic input | 45 | 2005-01-13 |
| Answered | AAbutPier | #190159 | Abutment wing wall reinforcement drawing | 64 | 2005-01-13 |
| Answered | AAbutPier | #190164 | Applying a longitudinally variable section to a pier | 65 | 2005-01-12 |