Skip to content
AnsweredAAbutPierQ&A #1221272013-10-16 20:47 · Views 187

BIB wing wall quantity calculation error

1. 첨부파일 시점부 날개벽과 같이 날개벽 구배가 (-) 일때 수량 산근이 오류가 발생합니다. 2. 첨부파일 종점부 날개벽에서, 교좌면 경계면에서 의미없는 단면 분활이 일어납니다. 확인부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 질의하신 사항을 수정하여 패치적용하였습니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#190149Seismic analysis modeling of a bridge with separated girders and slab492005-01-12
AnsweredAAbutPier#190147Please fix the error412005-01-12
AnsweredAAbutPier#190142Seismic analysis output512005-01-12
AnsweredAAbutPier#190140About widened bridges212005-01-12
AnsweredAAbutPier#190153Regarding post no. 12616352005-01-12
AnsweredAAbutPier#190145Stability check of an abutment on a mass foundation672005-01-12
AnsweredAAbutPier#190138Shear check of approach slab362005-01-12
AnsweredAAbutPier#190135Abutment wing wall reinforcement detailing432005-01-12
AnsweredAAbutPier#190132Pier at expansion joint332005-01-12
AnsweredAAbutPier#190129Foundation rebar specification issue422005-01-12
AnsweredAAbutPier#190128Error in bearing section when printing pier calculation report342005-01-12
AnsweredAAbutPier#190134Load calculation for pier structural analysis662005-01-12
AnsweredAAbutPier#190125Pier at expansion joint312005-01-12
AnsweredAAbutPier#190114*** please check232005-01-11
AnsweredAAbutPier#190119Abutment braking load512005-01-11
AnsweredAAbutPier#190118Please check pile shear stress462005-01-11
AnsweredAAbutPier#190116About IPC432005-01-11
AnsweredAAbutPier#190115Pile centroid load in abutment structural calculation report982005-01-11
AnsweredAAbutPier#190109Single-span continuous bridge fails with different girder counts232005-01-11
AnsweredAAbutPier#190110Drawing frame is not generated correctly92005-01-11
Sign in to ask