AnsweredAAbutPierQ&A #1220642013-10-12 01:21 · Views 260

Pier coping dimensions differ between general and reinforcement drawings

입력이 완료 됐는데 일반도와 배근도의 코핑 연장 치수가 상이합니다.. 오류 화면을 한글에 카피했으니 확인바랍니다.

Answer

안녕하세요. 한길아이티입니다. 질의하신 사항은 두부보 배근에서의 입력문제로 판단됩니다. 해당 부분을 권고안 으로 수정하는 테스트 동영상 첨부합니다. 감사합니다.

Attached images

1 attached file · Only the person who posted and our support staff can open them.

Sign in if this is your post

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#190104[Quantity] *** please check142005-01-11
AnsweredAAbutPier#190103About seismic analysis182005-01-11
AnsweredAAbutPier#190097Please check182005-01-10
AnsweredAAbutPier#190105About seismic analysis172005-01-10
AnsweredAAbutPier#190094Question about abutment section input192005-01-10
AnsweredAAbutPier#190090Abutment edge distance check752005-01-09
AnsweredAAbutPier#190089Quantity calculation report output problem532005-01-08
AnsweredAAbutPier#190082Uploading file312005-01-08
AnsweredAAbutPier#190073Braking load calculation452005-01-08
AnsweredAAbutPier#190072Quantity calculation report1242005-01-07
AnsweredAAbutPier#190069Program crashes when printing pier (P4)332005-01-07
AnsweredAAbutPier#190077Longitudinal rib342005-01-07
AnsweredAAbutPier#190053Pier calculation report output error362005-01-06
AnsweredAAbutPier#190051PIER 3 structural calculation report won't output482005-01-06
AnsweredAAbutPier#190049sap /asolver won't run292005-01-06
AnsweredAAbutPier#190046Rigid body check and section check for spread footing thickness1262005-01-06
AnsweredAAbutPier#190058Wind load calculation1422005-01-06
AnsweredAAbutPier#190048Seismic analysis error282005-01-06
AnsweredAAbutPier#190041File recovery inquiry302005-01-06
AnsweredAAbutPier#190038Internal program error (seismic analysis section and cross beam)402005-01-06
Sign in to ask