Skip to content
AnsweredAAbutPierQ&A #1213292013-09-03 20:04 · Views 284

Check of variable section at coping

코핑부 변단면 검토시 계산서와 프로그램상의 정보가 일치하지 않습니다. 확인부탁드립니다. ex) 프로그램 입력란 - 일반부 주철근 H25 간격100, 12개, 계산서 주철근 H25 간격100, 24개 확인 부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 답변이 늦어 죄송합니다. 해당 부분을 확인해보면, 두부보 변단면 부가 프로그램상에서의 적용은 일반단면이 되고 있습니다. 두부보의 옵션에서 두부보 변단면부를 변단면으로 선택되어져 있어 낮은 단면이 검토된 사항입니다. 해당 옵션을 일반단면으로 변경후 검토하시게 되면, 정상진행 가능합니다. 감사합니다.

Attached images 1Attached images 2

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#189409Borehole log is not generated92004-12-02
AnsweredAAbutPier#189407Pier calculation - uplift and buoyancy - column section values312004-12-02
AnsweredAAbutPier#189417Attachment for my [serviceability check - cracking] inquiry62004-12-01
AnsweredAAbutPier#189399Error in pier modeling analysis452004-12-01
AnsweredAAbutPier#189416Question about the bearing check in the pier calculation Excel sheet132004-12-01
AnsweredAAbutPier#189408Inquiry about [serviceability check - cracking]152004-12-01
AnsweredAAbutPier#189396Internal application error during pier modeling analysis312004-12-01
AnsweredAAbutPier#189382Inquiry432004-12-01
AnsweredAAbutPier#189381Applying stepped rebar to pier cap beam382004-12-01
AnsweredAAbutPier#189380Error when generating abutment (side-wall wing wall) drawings342004-12-01
AnsweredAAbutPier#189377This is Yeowon Bridge 2302004-12-01
AnsweredAAbutPier#189376Analysis result summary for mass foundation672004-11-30
AnsweredAAbutPier#189372Abutment check (pile foundation)332004-11-30
AnsweredAAbutPier#189393Semi-gravity abutment352004-11-30
AnsweredAAbutPier#189366Edge distance682004-11-30
AnsweredAAbutPier#189368Question about beam layout382004-11-30
AnsweredAAbutPier#189367Dimensions on general drawing512004-11-30
AnsweredAAbutPier#189358Please review212004-11-30
AnsweredAAbutPier#189364Structural calculation report not output for pier calculation272004-11-29
AnsweredAAbutPier#189360Wing wall haunch rebar check262004-11-29
Sign in to ask