Skip to content
AnsweredAAbutPierQ&A #1210372013-08-21 00:27 · Views 255

Horizontal rebar check

첨부화일 P1에서 교축방향 주철근 하면 H32-31ea+H29-30ea, 상면은 H25-31ea 로 배근했습니다 교직방향의 수평철근 검토에서는 H32-61ea+H25-31ea로 계산되는데 이것처럼 2cycle 철근이 반영이 안됩니다 확인부탁드립니다

Answer

안녕하세요. 한길아이티입니다. 질의하신 사항을 수정하여 10시경에 패치하도록 하겠습니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#189176Pier structural drawing232004-11-18
AnsweredAAbutPier#189168Soil cover load on pier602004-11-17
AnsweredAAbutPier#189167Calculation report - bearing area check432004-11-17
AnsweredAAbutPier#189163Applying soil cover load on pier292004-11-17
AnsweredAAbutPier#189162Abutment parapet distribution bar issue392004-11-17
AnsweredAAbutPier#189179Wind load intensity considering noise barrier502004-11-17
AnsweredAAbutPier#189178Moment due to dead load and moment due to wind load212004-11-17
AnsweredAAbutPier#189175Request232004-11-17
AnsweredAAbutPier#189174Pier cap check162004-11-17
AnsweredAAbutPier#189173About sketches in quantity calculation182004-11-17
AnsweredAAbutPier#189172Please review282004-11-17
AnsweredAAbutPier#189171Abutment wing wall rebar looks wrong242004-11-17
AnsweredAAbutPier#189158Pier reinforcement drawing312004-11-17
AnsweredAAbutPier#189150Follow-up question302004-11-17
AnsweredAAbutPier#189147Abutment footing plan reinforcement and design settings352004-11-17
AnsweredAAbutPier#189144Please check abutment road centerline dimensions342004-11-16
AnsweredAAbutPier#189143Please review492004-11-16
AnsweredAAbutPier#189141Seismic and slab input382004-11-16
AnsweredAAbutPier#189140In the abutment general drawing522004-11-16
AnsweredAAbutPier#189154Follow-up question322004-11-16
Sign in to ask