Member forces at the foundation center under foundation rotation

1. 기초 회전시 기초중앙에 작용 : 적용부재력 = 축방향력 x Cos α + 축직각방향력 x Sin α ; α = 45.0˚ 부호가 교축이든 교축직각이든 같아야 불리한 값을 산출할 수 있을것 같습니다. 올려드린 sample은 부호가 반대입니다. 검토 바랍니다.

Answer

안녕하세요. 한길아이티입니다. 질의하신 사항에 대해서, 교각입력-설계환경-설계선택사항탭-기둥의 기둥부 모멘트 절대값 적용의 옵션이 기초 회전의 값에도 적용되도록 수정하여 패치적용하였습니다. 절대값이 적용되어 모멘트 적용값들의 변경이 발생합니다. 감사합니다.

Attached images 1

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#187630Hollow pier P-M interaction diagram output error382004-08-20
AnsweredAAbutPier#187626About rebar input for bearings92004-08-20
AnsweredAAbutPier#187625Ground data mismatch in abutment foundation ground information392004-08-20
AnsweredAAbutPier#187629Approach slab drawing generation error422004-08-20
AnsweredAAbutPier#187622Incorrect dimensions shown for the uplift restraint device on abutment back face342004-08-20
AnsweredAAbutPier#187621Foundation design in pier calculation report212004-08-20
AnsweredAAbutPier#187617Uploading the file discussed by phone on deep beam shear design62004-08-20
AnsweredAAbutPier#187614Guyeong Bridge 2 file82004-08-19
AnsweredAAbutPier#187612Reactions in abutment structural calculation report differ from input values432004-08-19
AnsweredAAbutPier#187611Output does not work262004-08-19
AnsweredAAbutPier#187604Drawing generation error332004-08-19
AnsweredAAbutPier#187603Shear rebar arrangement412004-08-19
AnsweredAAbutPier#187605Pier foundation342004-08-19
AnsweredAAbutPier#187602About the pier calculation report602004-08-19
AnsweredAAbutPier#187595Error marks appear in the input tree, please take a look352004-08-19
AnsweredAAbutPier#187598Question about merging files532004-08-18
AnsweredAAbutPier#187590Structural calculation report - ultimate section forces in foundation design422004-08-18
AnsweredAAbutPier#187587Is substructure design possible after beam layout?422004-08-18
AnsweredAAbutPier#187586Pier structural calculation812004-08-18
AnsweredAAbutPier#187581Abutment structural calculation (parapet on approach slab side)352004-08-18
Sign in to ask