AnsweredAAbutPierQ&A #1178392013-04-25 11:14 · Views 215

Can loads at the pile group centroid be calculated for pile checks?

첨부한 그림과 같이 지장물로 인하여 교각기초 위치가 이동이 되었습니다. 이럴때 말뚝검토를 위해 기둥이 기초 중앙에서 편심이 걸린것과 회전한 상태의 고려가 말뚝도심하중산정에 모두 적용되는지 궁금합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#186631About drawings342004-06-27
AnsweredAAbutPier#186627About drawing generation102004-06-26
AnsweredAAbutPier#186624Attaching a file122004-06-26
AnsweredAAbutPier#186630Required support length, couplers152004-06-26
AnsweredAAbutPier#186622ADwgMaker error132004-06-26
AnsweredAAbutPier#186612Seismic calculation report102004-06-26
AnsweredAAbutPier#186607Seismic calculation report output error92004-06-26
AnsweredAAbutPier#186620Steel quantity comes out slightly off72004-06-25
AnsweredAAbutPier#186603I want to change the seismic load102004-06-25
AnsweredAAbutPier#186610About cast-in-place piles122004-06-25
AnsweredAAbutPier#186601About piles142004-06-25
AnsweredAAbutPier#186600About wind load in pier analysis302004-06-25
AnsweredAAbutPier#186595When using shoe coordinates192004-06-25
AnsweredAAbutPier#186593Reposting122004-06-25
AnsweredAAbutPier#186589Internal application error122004-06-25
AnsweredAAbutPier#186586Inconsistent application of EL calculation basis152004-06-25
AnsweredAAbutPier#186583Please review132004-06-24
AnsweredAAbutPier#186582About the end bearing capacity qd value122004-06-24
AnsweredAAbutPier#186580Please review142004-06-24
AnsweredAAbutPier#186578Entering the groundwater level192004-06-24
Sign in to ask