How to input EQS products
면진해석을 수행하고 EQS규격,강성을 가지고 있는 상태인데 입력을 무엇으로 해야하지요? 받침선택에서 EQS를 선택한다면 PTFE강성이나 MER SPRING강성을 선택하라고 나오는데 그런거 선택하지 않고 EQS강성을 입력하는 방법이 무엇이지요? 그리고 1차강성.2차강성.유효강성을 어디다가 입력해야하는건가요?
Answer
안녕하세요. 한길아이티입니다. 현재 프로그램에서 구현된 사항은 임의의 강성을 입력받도록 구성되어있지 않습니다. 현재의 프로그램은 PTFE계수 와 MER 계수를 통해서 프로그램이 강성을 계산하여 그 값을 적용하도록 되어져 있는 사항입니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #186221 | In the coordinate and EL calculation drawings | 4 | 2004-06-10 |
| Answered | AAbutPier | #186214 | When entering bridge bearings | 7 | 2004-06-10 |
| Answered | AAbutPier | #186210 | [Urgent] Rebar data issue | 11 | 2004-06-10 |
| Answered | AAbutPier | #186199 | Bearing rebar diameter cannot be changed | 9 | 2004-06-09 |
| Answered | AAbutPier | #186197 | Wing wall rebar quantity | 5 | 2004-06-09 |
| Answered | AAbutPier | #186195 | Pier tie bars | 4 | 2004-06-09 |
| Answered | AAbutPier | #186188 | Applying piles individually | 11 | 2004-06-09 |
| Answered | AAbutPier | #186187 | Skew angle representation | 19 | 2004-06-09 |
| Answered | AAbutPier | #186207 | In the bridge bearing detail | 15 | 2004-06-09 |
| Answered | AAbutPier | #186202 | Follow-up question | 4 | 2004-06-09 |
| Answered | AAbutPier | #186189 | Reaction values | 22 | 2004-06-09 |
| Answered | AAbutPier | #186185 | About hollow pier drawings | 16 | 2004-06-09 |
| Answered | AAbutPier | #186184 | About the general drawing | 19 | 2004-06-09 |
| Answered | AAbutPier | #186182 | Error generating T-shaped pier calculation report | 22 | 2004-06-09 |
| Answered | AAbutPier | #186181 | When applying wind load | 21 | 2004-06-09 |
| Answered | AAbutPier | #186171 | Rebar labels missing in section details | 7 | 2004-06-08 |
| Answered | AAbutPier | #186166 | Foundation design | 11 | 2004-06-08 |
| Answered | AAbutPier | #186163 | Seismic analysis modeling | 26 | 2004-06-08 |
| Answered | AAbutPier | #186162 | Error after patch | 15 | 2004-06-08 |
| Answered | AAbutPier | #186178 | Hollow pier calculation report and drawings | 39 | 2004-06-08 |